Time Management Analysis of Project Delays Using the Earned Value Method: A Case Study of the Mbambang River Gabion Construction Project, Malang Regency
Keywords:
Construction Delay, Earned Value Method (EVM), Gabion Construction, Mbambang River Project, Schedule Performance Index (SPI), Time ManagementAbstract
Construction project delays are among the most common challenges affecting project performance, particularly in terms of schedule achievement, resource utilization, and overall project efficiency. The gabion retaining structure construction project at the Mbambang River, Malang Regency, experienced schedule deviations that potentially impacted the timely completion of the project. Effective time management is therefore essential to evaluate project performance and identify corrective actions required to mitigate delays. This study aims to analyze project time management associated with construction delays in the Mbambang River gabion works using the Earned Value Method (EVM). The Earned Value Method was employed as an integrated project control technique that combines schedule performance, cost performance, and physical work progress into a single analytical framework. The analysis was conducted using key EVM indicators, including Planned Value (PV), Earned Value (EV), Actual Cost (AC), Schedule Variance (SV), and Schedule Performance Index (SPI). Project data were obtained from the baseline schedule, progress reports, and actual project implementation records throughout the construction period. These indicators were subsequently used to assess schedule performance, determine the extent of project delays, and estimate the projected completion time based on actual project progress. The results indicate that the project experienced schedule delays, as reflected by negative Schedule Variance (SV) values and a Schedule Performance Index (SPI) of less than one during several reporting periods. These findings demonstrate that the actual work progress achieved was lower than the planned progress, resulting in delays in project execution. The application of EVM proved effective in providing a comprehensive assessment of project performance, enabling early detection of schedule deviations and supporting decision-making processes for implementing acceleration strategies. Therefore, the Earned Value Method can serve as a reliable project control tool for improving time management performance in river protection projects, particularly those involving gabion construction works.