Analysis of Factors Contributing the Acceleration of Stone Masonry Construction Activities Using the Fast-Track Method in the Kedunglarangan River, Pasuruan Regency

Authors

  • Muhammad Inan Kautsar Universitas 17 Agustus 1945 Surabaya
  • Andi Patriadi Universitas 17 Agustus 1945 Surabaya
  • Esti Wulandari Universitas 17 Agustus 1945 Surabaya

Keywords:

Construction Management, Fast-Track Method, Kedunglarangan River, Project Acceleration, Riverbank Reinforcement, Stone Masonry

Abstract

The stone masonry work for riverbank reinforcement along the Kedunglarangan River in Pasuruan Regency is a crucial mitigation effort aimed at controlling erosion, preventing riverbank failures, and protecting nearby residential areas and public infrastructure. The increasing risk of damage caused by river scouring and landslides, which may disrupt major transportation routes and community activities, necessitates the timely completion of construction works without compromising quality standards. Therefore, an effective project acceleration strategy is required through the implementation of the Fast-Track method. This study aims to analyze the factors that contribute to accelerating stone masonry construction activities in the Kedunglarangan Riverbank Reinforcement Project using the Fast-Track approach. A quantitative descriptive method was employed by identifying construction activities that could be executed concurrently while maintaining the logical dependencies among tasks. Research data were collected from project schedules, technical documents, field observations, and interviews with project stakeholders. The results indicate that project duration can be significantly reduced through the optimization of material availability, effective workforce allocation, adequate equipment readiness, improved coordination among construction activities, and the implementation of overlapping work sequences. The most influential factors in the successful application of the Fast-Track method are the continuity of material supply and the synchronization of field operations. The application of the Fast-Track method has proven effective in shortening the project duration, enabling faster completion of riverbank reinforcement works and reducing the potential risks of environmental damage and disruptions to community activities.

Downloads

Published

2026-09-23

Issue

Section

Articles