Construction projects, particularly healthcare support facilities, face high levels of uncertainty and risk that may affect project performance in terms of time, cost, quality, and safety. This study aimed to analyze and control risks in the construction of the Temporary Storage Warehouse for Hazardous and Toxic Waste (B3) at RSUD Mangkujaya Linggang, West Kutai Regency, using the Hazard Identification, Risk Assessment and Risk Control (HIRARC) and House of Risk (HOR) methods. This research applied a mixed-method approach through observations, interviews, questionnaires to 15 respondents, FGD, and project document analysis. Risk levels were assessed using Likelihood (L) and Severity (S), while mitigation priorities were determined using HOR analysis. The results identified 12 major risks, with dominant risks consisting of material delay (R = 16.79), work accidents (R = 16.62), and structural work delay (R = 15.99). A total of 75% of risks were classified as high risk and 25% as medium risk. The main risk causes were material distribution delays, low K3 compliance, and limited workforce competency. Priority mitigation strategies included K3 training and mandatory PPE use, technical supervision, and logistics planning with material buffer stock. Risk control implementation reduced project risks by approximately 26–35%, improved cost efficiency by 10–15%, and increased the Project Performance Index (PI) from 92% to 105%. The study concludes that integrating HIRARC and HOR is effective in reducing project risks and improving overall construction project performance.

Downloads

Published

2026-09-23

Issue

Section

Articles