Application of Value Engineering in Cost Optimization and Function of Rehabilitation Work on Irrigation Network D.I. Pesap, East Kutai Regency
Keywords:
Cost Efficiency, Function Optimization, Irrigation Network, Rehabilitation, Value EngineeringAbstract
Irrigation infrastructure is fundamental to agricultural productivity and national food security. The D.I. Pesap irrigation network in East Kutai Regency, East Kalimantan, required rehabilitation due to physical deterioration of canals, inspection roads, and hydraulic structures. The rehabilitation project, however, encountered challenges related to high construction costs that were not fully proportional to the functional improvements achieved. Two work items—the inspection road and the secondary canal—dominated the budget, collectively accounting for 84.16% of total analyzed project costs. This study applied the Value Engineering (VE) methodology to systematically optimize costs and functions without reducing quality or performance. Using a quantitative descriptive approach, the analysis followed five VE phases: Information Phase, Function Analysis Phase, Creative Phase, Evaluation Phase, and Recommendation Phase. Data were collected from the Bill of Quantities (BOQ), working drawings, technical specifications, and field observations from the 2025 Fiscal Year project of the Kalimantan IV River Basin Hall. Pareto analysis was used to identify dominant cost items. Function analysis revealed cost-worth imbalances in both work items. Creative alternatives were developed through material substitution and design optimization. Results demonstrate that VE produced a 26.12% cost saving for inspection road works through substitution of local soil combined with sirtu material and mechanical vibratory roller compaction, and an 11.75% saving for secondary canal works through concrete grade optimization (fc'15 MPa to fc'12.5 MPa) with reduced reinforcement and selective waterstop placement. Total cost savings reached IDR 1,271,645,498, equivalent to 19.72% of the initial analyzed project cost. Functional evaluation confirmed that the inspection road's operational access function and the secondary canal's hydraulic conveyance function were fully maintained. These findings demonstrate that Value Engineering effectively enhances project value by eliminating unnecessary costs while preserving infrastructure function and quality.