Risk Analysis of the Construction Project for the Community Hall (BPU) Building in Jembayan Tengah Village, Kutai Kartanegara Regency, East Kalimantan
Keywords:
BPU building, construction project, risk management, risk mitigation, project performanceAbstract
The construction of the Community Hall (Balai Pertemuan Umum/BPU) Building in Jembayan Tengah Village faces various risks that may affect project performance in terms of time, cost, quality, and occupational health and safety (OHS). This study aims to identify the level of risks, determine dominant risks, and evaluate the effectiveness of mitigation strategies in improving project performance. The research employs a descriptive quantitative approach using a survey method through Likert-scale questionnaires, interviews, and project document analysis. The analysis is conducted using probability (P), impact (I), and risk level (R = P × I) assessment. The results show that there are 14 main risks, categorized into technical (35.71%), managerial (28.57%), labor-related (21.43%), and environmental (14.29%) risks. A total of 78.57% of the risks fall into the high and very high categories, with an average risk value of 13.26. The dominant risks are material delays (R = 17.22), schedule delays (R = 16.00), occupational accidents (R = 15.48), and poor concrete quality (R = 15.12). The main contributing factors are logistics and management issues, accounting for 57.14% of the causes. The implementation of mitigation strategies, including avoidance, reduction, transfer, and acceptance, successfully reduced the average risk level by 25.40%. Improvements were observed in project performance, with reductions in time (20.92%), cost (22.49%), quality (23.36%), and OHS risks (30.55%). This study demonstrates that systematic and structured risk management can improve construction project performance more effectively, efficiently, and safely.