Value Engineering Analysis on the Continuation Construction Work of the East Kutai District Police Headquarters (Mako Polres Kutai Timur)

Authors

  • Murjito Murjito Universitas 17 Agustus 1945 Surabaya
  • Laksono Djoko Nugroho Universitas 17 Agustus 1945 Surabaya
  • Ony Frengky Rumihin Universitas 17 Agustus 1945 Surabaya

Keywords:

Cost Efficiency, Pareto Analysis, Value Engineering

Abstract

Value Engineering (VE) analysis was applied to the continuation project of the East Kutai District Police Headquarters (Mako Polres Kutai Timur) construction to optimize construction costs without reducing the building’s function and quality. Through Pareto analysis, the Traffic Police Headquarters Building (Mako Satlantas) and Supporting Facilities were identified as the dominant cost components, amounting to IDR 20,446,535,470.42 or 56.52% of the total project cost before tax. Based on the criteria of high cost, large work volume, and cost-saving potential, the conventional red brick wall system (baseline A0) was selected for evaluation against three alternative wall materials, namely AAC lightweight brick (A1), lightweight precast panel (A2), and high-quality pressed concrete block (A3). The results of the multi-criteria evaluation indicated that AAC lightweight brick (A1) was the most optimal alternative. The implementation of AAC lightweight brick generated direct cost savings of IDR 131,977,910.16 or 8.20% of the initial wall system cost and contributed 0.33% savings to the total project value. In addition, the use of AAC lightweight brick reduced the building dead load by 335.09 tons (63.89%) and accelerated wall construction duration from 91 days to 52 days, resulting in a schedule compression of 42.86%. The study concludes that the Value Engineering method is effective in improving project cost efficiency and value without reducing the building’s function and quality.

Downloads

Published

2026-09-23

Issue

Section

Articles