Analysis of Factors Causing Delays in the Sidorejo Road Handling Project, Lempake Village, North Samarinda District, Samarinda City
Keywords:
CPM, Material Distribution, Project Delay, Project Management, RIIAbstract
The Sidorejo Road Handling Project in Lempake Village, North Samarinda District, Samarinda City is a road infrastructure project that experienced several delays during its execution. These delays were influenced by material, project management, equipment, labor, and environmental factors. This study aims to identify the dominant factors causing delays and to analyze the impact of material distribution delays on project cost and time. A quantitative approach was applied using Relative Importance Index (RII) analysis, Critical Path Method (CPM), S-Curve analysis, and material delay simulation. Data were collected through field observations, interviews, and project documentation. Results showed that material factors were the dominant cause of delays with a weight of 35%, followed by project management (25%), equipment (18%), labor (15%), and environmental factors (7%). Delays in material distribution caused a 10-day project delay and increased project costs by IDR 277,500,000 (3.44% of the planned budget). Simulation results further confirmed that greater material distribution delays lead to proportionally larger increases in project time and cost. These findings underscore the critical importance of effective material control systems and coordinated scheduling in road construction project management.