Review of Cost and Time Performance on the Continuation Work of Al-Hasnie Road Improvement, Bantuas Village, Palaran District, Samarinda City

Authors

  • Alviorika Dwiyana Ratu Universitas 17 Agustus 1945 Surabaya
  • Laksono Djoko Nugroho Universitas 17 Agustus 1945 Surabaya
  • Ony Frengky Rumihin Universitas 17 Agustus 1945 Surabaya

Keywords:

Earned Value Management (EVM), ram Evaluation and Review Technique (PERT), Project Performance

Abstract

Road infrastructure plays a strategic role in supporting economic growth and community mobility. This study aims to analyze the cost and time performance of the Al-Hasnie Road Improvement Continuation Project located in Buntusu Village, Palaran District, Samarinda City using the Earned Value Management (EVM), Program Evaluation and Review Technique (PERT), and Estimate at Completion (EAC) approaches. The project contract value was Rp8,675,041,441 with an implementation duration of 100 calendar days. The research data were obtained from project implementation reports, including actual costs, work progress, and project schedules. The EVM analysis in the 9th week showed a Schedule Performance Index (SPI) value of 3.91 and a Cost Performance Index (CPI) value of 0.95. An SPI value greater than 1 indicates that the project was ahead of schedule, while a CPI value below 1 indicates that the actual costs were slightly higher than the planned costs. The Schedule Variance (SV) value of Rp34,000,000 indicates accelerated project progress, while the Cost Variance (CV) value of Rp92.4 billion shows a deviation from the planned budget. The PERT analysis indicated a 100% probability of project completion before 100 days, with an estimated completion time of 73 days. The EAC calculation estimated the total final project cost at Rp8,765,041,441. Overall, the project demonstrated good time performance due to accelerated work progress; however, stricter cost control is required to prevent budget overruns. This study shows that the combination of EVM, PERT, and EAC methods is effective for evaluating and predicting construction project performance quantitatively.

Downloads

Published

2026-09-23

Issue

Section

Articles