Operation Planning Analysis of Bus Rapid Transit on the Porong-Pasuruan Corridor Based on Travel Demand

Authors

  • Dimas Wisnu Haryoko Universitas 17 Agustus 1945 Surabaya
  • Budi Witjaksana Universitas 17 Agustus 1945 Surabaya
  • Hanie Teki Tjendani Universitas 17 Agustus 1945 Surabaya

Keywords:

Benefit Cost Ratio, Bus Rapid Transit (BRT), Buy the Service (BTS), Public Transportation

Abstract

Transportation is a strategic sector that plays a vital role in supporting economic growth. This study evaluates the demand for a BRT-based public transportation service along the Porong–Pasuruan corridor. Utilizing the Four-Step Model and a stated-preference approach, the study identifies potential passenger generation, calculates Vehicle Operating Costs (VOC), and evaluates investment feasibility using Net Present Value (NPV), Benefit-Cost Ratio (BCR), Internal Rate of Return (IRR), and Payback Period (PP) indicators. The results indicate that travelers’ willingness to shift modes reaches 59.8%, resulting in a potential BRT demand of 27,084 passengers per day. The proposed route connects Porong Terminal and Untung Suropati Terminal, with route lengths of 33.3 km for the Porong–Pasuruan direction and 33.5 km for the Pasuruan–Porong direction. The service is planned to use medium-sized buses with a capacity of 30 passengers and a service headway of 14.65 minutes. The financial feasibility analysis under the buy-the-service operational scheme yields a benefit-cost ratio value of 1.10, indicating that the financial benefits generated by the investment and operation of the BRT service exceed the costs incurred by the operator. Therefore, the project is considered financially feasible from the perspective of the service operator.

Downloads

Published

2026-09-23

Issue

Section

Articles