Integrated Flood Risk Management in Bridge Construction: A CPM-Based Framework for EOT Justification and Schedule Recovery

Authors

  • Nizamuddin Fairus Zakaria Universitas 17 Agustus 1945 Surabaya
  • Risma Marleno Universitas 17 Agustus 1945 Surabaya
  • Laksono Djoko Nugroho Universitas 17 Agustus 1945 Surabaya

Keywords:

Bridge Construction, CPM Framework, EOT Justification, Flood Force Majeure, Schedule Recovery

Abstract

Flooding is one of the most disruptive force majeure events in bridge construction, yet contractors frequently lack a structured framework to quantify its contractual and financial impacts. This paper presents a CPM-based framework — structured across Preventive, Responsive, and Recovery stages — to support Extension of Time (EOT) justification and schedule recovery in flood-affected bridge projects. A case study of the Kaliwekas-Bangeran 5 Bridge Replacement Project in Bojonegoro Regency (contract value: Rp 898,332,431; 90 calendar days) was used to validate the framework. Flood disruptions documented in field supervisor records and corroborated by BMKG rainfall data (peak: 56.4 mm/day, classified Heavy Rain) caused work stoppages on two activities: Structure Excavation (14 days) and Ferrocement (28 days). CPM re-analysis using ProjectLibre determined a 14-calendar-day project overrun, forming the legal basis for EOT entitlement under Articles 1244–1245 of the Indonesian Civil Code. Schedule recovery was achieved through incremental crashing of 12 critical activities using 3-hour overtime, yielding an optimal additional direct cost of Rp 30,130,315 — only 3.35% of total contract value. The framework was translated into a practical 21-step work guideline supported by a 12-document legal checklist, enabling contractors to substantiate EOT and acceleration cost claims with full technical and contractual accountability.

Downloads

Published

2026-09-23

Issue

Section

Articles