Time Efficiency Analysis OF Riverbank Protection Project Acceleration Using THE Critical Path Method (CPM) in the Masangan River, Pasuruan Regency

Authors

  • Ahzam Zarkasy Septian Danu Universitas 17 Agustus 1945 Surabaya
  • an Patriadi Universitas 17 Agustus 1945 Surabaya
  • Esti Wulandari Universitas 17 Agustus 1945 Surabaya

Keywords:

Critical Path Method (CPM), Time Efficiency, Project Acceleration, Critical Path, Riverbank Protection, Masangan River

Abstract

Time delay is one of the most common issues encountered in construction projects and can significantly affect project performance and efficiency. In the riverbank protection project of the Masangan River, Pasuruan Regency, construction activities experienced delays due to unfavorable weather conditions, fluctuating river discharge, and limited effective working hours caused by tidal influences. These constraints hindered project progress and prevented several activities from being completed according to the planned schedule. Therefore, an effective scheduling and acceleration strategy is required to optimize project completion time. This study aims to analyze the time efficiency achieved through project acceleration using the Critical Path Method (CPM). The CPM approach was employed to identify critical activities that directly influence the overall project duration through network scheduling analysis, including the determination of Early Start (ES), Early Finish (EF), Late Start (LS), and Late Finish (LF) times, as well as the identification of the critical path. Activities located on the critical path were prioritized in the acceleration strategy to reduce the overall project duration while maintaining logical relationships among project activities. The analysis was supported by Microsoft Project software to facilitate accurate scheduling and project control. The results of this study are expected to demonstrate the extent of time efficiency that can be achieved through the application of CPM-based acceleration strategies. Furthermore, the findings are intended to provide practical guidance for project managers in controlling construction schedules and serve as a reference for similar riverbank protection projects facing time-performance challenges.

Downloads

Published

2026-09-23

Issue

Section

Articles