An Operational Analysis of Pre-loading Capacity Constraints at the Ketapang-Gilimanuk Crossing

Authors

  • Abdurrahman Mahdy Al Faishal Universitas 17 Agustus 1945 Surabaya
  • Hanie Teki Tjendani Universitas 17 Agustus 1945 Surabaya
  • Budi Witjaksana Universitas 17 Agustus 1945 Surabaya

Keywords:

Berth Occupancy Ratio (BOR), Ready-to-Load Parking Capacity, LCM Pier, Ketapang Port

Abstract

Ketapang Ferry Port is a primary-class port serving as a vital link for land connectivity between the islands of Java and Bali. The integration of the Trans-Java Toll Road has triggered induced demand, resulting in a significant surge in vehicle volume. This study aims to determine the ideal capacity for the "ready-to-load" parking area based on operational performance, specifically by evaluating the Berth Occupancy Ratio (BOR) for Landing Craft Machine (LCM) docks. Furthermore, this study analyzes the economic feasibility of expanding the LCM parking facilities. The research methodology employs the Berth Occupancy Ratio (BOR) analysis—in accordance with the Decree of the Director General of Land Transportation (KP-DRJD 539/2022) and UNCTAD standards—alongside calculations for ready-to-load parking capacity. Economic feasibility is assessed using Net Present Value (NPV), Internal Rate of Return (IRR), and Benefit-Cost Ratio (BCR) parameters. The results indicate that the required "ready-to-load" parking area for the LCM dock at Ketapang Ferry Port is 3,825 $m^2$ for Class VII vehicles and 5,346 $m^2$ for Class VIII vehicles. The operational performance of the LCM dock, based on the BOR, is 46% during normal conditions and 53% during peak seasons. Economic feasibility analysis for the parking area expansion yielded positive results across all tested interest rates. With a Benefit-Cost Ratio (BCR) greater than 1.00 and an Internal Rate of Return (IRR) reaching 46%, the project is deemed highly feasible for implementation.

Downloads

Published

2026-09-23

Issue

Section

Articles