Analysis of Delays and Queue Lengths Caused by the Closure of Railway Crossings: Study Case of Jaksa Agung Suprapto Road, Lamongan Regency
Keywords:
degree of saturation, delay, level crossing, queue length, PKJI 2023, traffic performanceAbstract
At-grade railroad crossings can cause traffic disruptions in the form of delays and long vehicle queues. This study aims to analyze the impact of railroad crossing closures on traffic performance on Jaksa Agung Suprapto Road, Lamongan Regency. The research method employed field surveys and analysis based on the 2023 Indonesian Road Capacity Guidelines (PKJI). The results show that the highest traffic volume reached 1,660 vehicles per hour in the Babat–Surabaya direction and 1,743 vehicles per hour in the Surabaya–Babat direction. Road capacity is 1,878 vehicles per hour with saturation levels of 0.88 and 0.92, respectively. The longest duration of a level crossing closure was 531 seconds. The maximum delay reached 578 seconds in the direction of Surabaya and 248 seconds in the direction of Babat, with average queue lengths of 130.41 meters and 104.53 meters, respectively. The results of the study indicate that the longer the duration of the level crossing closure and the higher the vehicle volume, the greater the delay and queue length. These conditions indicate that level crossings remain a factor affecting traffic performance on the Jaksa Agung Suprapto Road section in Lamongan Regency.