Implementation Value Engineering on the Project Building Construction Guest House in Mojokerto District

Authors

  • Bias Angga Permana Universitas 17 Agustus 1945 Surabaya
  • Wateno Oetomo Universitas 17 Agustus 1945 Surabaya
  • Risma Marleno Universitas 17 Agustus 1945 Surabaya

Keywords:

Value Engineering, Efficiency, Construction, Economical, Quality

Abstract

Data analysis is the process of processing data to obtain useful information that can be used to make decisions about how to solve problems. In this study, the Value Engineering method is also known as "value engineering", used to conduct data analysis systematically and planned. The following are the steps taken to analyze data using the value engineering method in this study. Information phase (Information phase),Creative phase (creative phase), Assessment Phase (judgment phase),Development Phase (Development phase),and Presentation Phase. Based on the evaluation analysis that has been carried out in the application of Value Engineering in the concrete work of the Construction of the Mojokerto Regency Guest House Building, with reference to the Value Engineering Work Plan, several conclusions can be drawn below: a)Value Engineering on the main structural work, namely Columns and Floor Plates in the Construction of the Guest House Building in Mojokerto Regency, b)After several alternatives were carried out, the following proposals were implemented: Column with a span of 4.0 m uses an initial dimension of 50/50 and the column after VE uses a dimension of 40/40. The thickness of the floor slab uses an initial dimension of 15 cm and the floor slab after VE uses a thickness of 12 cm. Savings obtained from the application of Value Engineering above are as follows: With concrete columns, the initial design cost comparison was Rp. 711,395,176 and the cost from the analysis results. Value Engineering of Rp 536,582,759, this means that from the results of Value Engineering there are savings of Rp 174,812,417, the costs obtained are smaller than the initial design costs of 24.57%. Floor Plate obtained a comparison of the initial design cost of Rp 325,855,144 and the cost from the Value Engineering analysis results of Rp 243,169,596, this means that from the Value Engineering results there are savings of Rp 82,685,548, the costs obtained are smaller than the initial design costs of 25%.

Downloads

Published

2026-03-05

Issue

Section

Articles