Return to Article Details
Analysis of the Impact of Material Distribution Delays on the Time and Cost of Follow-Up Works for the Revitalization of Pedestrian Areas and Supporting Structures in the Karang Mulyo 2 Area, Berau Regency
Download
Download PDF